RemedialPlan by DampSurvey-Pro · Built for damp, timber and remedial surveyors

Practical surveyor guide

How to draw a remedial floor plan.

A useful remedial plan starts with an accurate site record, then connects readings, affected areas, photographs and proposed works to the right place.

A measured floor plan being prepared in the RemedialPlan survey workspace
A digital workspace can keep room geometry, survey evidence and treatment markings in the same record.

A step-by-step site workflow

  1. Record the property and floor. Note the property reference, inspection date, floor name and any orientation information the reader will need.
  2. Measure the room layout. Record room width and depth, wall positions, circulation, doors and windows. Check that adjoining rooms connect logically and that the overall footprint is plausible.
  3. Use consistent symbols and a legend. Give each type of reading, defect or proposed work a distinct symbol or line style, then explain it in the plan legend.
  4. Mark readings and affected areas. Put moisture readings at their observed locations. Show the extent of damp, mould, high ground or damaged finishes rather than relying on a room-level note alone.
  5. Link photographs to the plan. Number the photographs and place matching references on the drawing. Captions should identify the room and what the image demonstrates.
  6. Specify remedial works. Draw the proposed extent and give each item a clear reference. Keep observations and recommendations distinct so the reader can tell evidence from specification.
  7. Check and issue with the report. Review dimensions, labels, references, legends and treatment extents. State that the drawing is schematic when it is not a scale drawing, then issue it with the written survey report.

Where RemedialPlan fits

RemedialPlan provides drawing, evidence and proposed-work tools designed around this process. It can reduce the need to recreate a rough site sketch later, but it does not replace the surveyor’s inspection, diagnosis or professional judgement.

Before issue: confirm every measurement, reading, photograph reference and remedial specification against your site notes and written report.

Draw your next survey with RemedialPlan.

Try the complete workspace for 7 days. No payment details required.

Start free trial